Hi All,
I have a Cisco C-Series C240 M3 with a CPU cycle of 2.4Ghz with 8 Cores.
I am using Vsphere 5.1 and would like to install an OS as VM which require 2.8Ghz CPU Cycle.
Is it possible to increase the clock speed to 2.8 to meet the requirement?
Is there any possible work around for this?
thanks in advance.