Quantcast
Viewing all articles
Browse latest Browse all 176483

First Linked Pool fails to ever finish provisioning. Guests are "on" inside ESXi.

I'm at another "stuck" point.

 

My linked clone pool refuses to finish. Here are my events from the relevent time period (most recent in first screenshot):

 

http://screencast.com/t/KJM6k67qTZ

 

Basically.. the events show the following:

 

1. Trying to provision.

2. Successfully configured video settings for Machine VM (three A-OK)

3. Provisioning error occured for (all three machines): Customization operation timed out.

4. Automatic error recover for Pool.

5. Attempting to restart (all three machines).

6. Automatic error recovery for pool: Delete all three machines.

7. Successful delete of all three machines.

8. Go to 2.

 

And repeat all night / day long.

 

In connecting to the ESXi server I find:

 

1. All three VMs are started.

2. They're waiting for someone to CTL-ALT-DEL them.

3. In spot checking, (and manually logging on)

they ARE getting DHCP (which I learned could be a cause of failure to provision; but this is not problem)

 

Any thoughts?

 

Attached my vCenter logs if that would help. Thanks !


Viewing all articles
Browse latest Browse all 176483

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>