Hello,
I am trying to to do a consolidation scenario for a client based only on the hours of 8am to 5pm. I cant seem to find a way to tell cap planner to consider on the the hours that I specify.
Why am I doing this? The client uses an internet based backup solution that runs every 15 minutes for all servers. This backup is causing the IOPS per server to be between 1500 and 2000. This is not real as this backup is going away when I virtualize the environment. The IOPS are much more reasonable with the backup not running between 8 and 5 but remain silly high off hours thus causing cap planner to recommend 1 host per virtualized server.
Is it possible to do what I need to do?
Thanks