Hi,
Me again - sorry. I think we are close. I am now stuck on resolving the workloads in my tiles.
- I am doing a partial tile, and I have excluded the standby/ deploy/ exchange related tests.
I have configured the host files for the workload VMs as well as the prime client, and I am able to ping each workload in the tile by name.
- I have stuck with the recommended naming convention
I have attached my host file from the primeclient as well as the associated results file, and my vmark config file - everything is in the zip file.
It's weird because initially, I did have the workload names spelled wrong initially in the config file - forgot to put the 0 at the end of each name. But I fixed that, and the correct name is showing up in the error stating that it cannot be resolved so it looks like it got the config file change.